Case Studies
Keeping water out of subsea distribution systems is a challenge, and we’re working with a major operator to keep their systems going.
download as pdfWhen Jadestone needed a zone-rated, bespoke marine growth cleaning solution to facilitate a tie-in via a spare I-tube they came to Blakemere. Did we mention we needed to go down the I-tube?
download as pdfOver the years we have supplied all manner of bespoke subsea plugs in support of BHP’s decommissioning activities. Here is the most recent.
download as pdfHow do you find out if there is pressure under the cap of a subsea well that was suspended in the 1960’s? Without taking the cap off? We didn’t know either until we did it.
download as pdfWhen Clough needed to cut a one meter diameter hole through Mundaring Weir they came to us. Designing the world’s largest underwater diamond drill was one thing, but what do you do with three tonnes of concrete down a well?
download as pdfWe specialise in using technology to remove humans from danger. That’s why we developed a way of installing Grayloc blind caps subsea and safely, rather than topside with a technician.
download as pdfThis is how you pass a chemical bunkering hose over the gunwale of a ship quickly and safely. Better still, the quick change-out system means you can even swap the hose out for different chemicals in minutes.
download as pdf